Monday, November 26, 2012

Restore the Shore Better than Before!

You have seen the disaster photos over and over, but what I noticed in these photos was that the most basic forms of transportation - walking and biking were the only viable ways to get around in the hours immediately after the storm. In the absence of subways, traffic signals and even gas stations, Bike Portland did an excellent job of documenting the surge of bicycle traffic in Lower Manhattan and Brooklyn. On a lesser scale pictures from the barrier islands showed the same thing. Roads were either destroyed or covered with sand and debris that made car travel impossible.

Buried within the $30 billion dollar price tag are miles of damaged boardwalks and multi-use paths.Check out the shambles left over from the Sandy Hook Bikeway and the Henry Hudson Trail.  The tourist packed boardwalks will be rebuilt very quickly (perhaps too quickly). But the lesser used off-road paths may be pushed way down the priority list and perhaps in the case of the frequently damaged Bayshore section of the Henry Hudson Trail,a discussion about a total redesign. It is going to take a concerted effort by bicycle and walking advocates to bring these trails back up to speed

Multi-Use Path at Sandy Hook


The discussion of sustainable redevelopment of the coast is focused around the restoration of natural features to buffer the damage that robust coastal storms bring as well as implementing stricter building codes. But this rebuild is also an opportunity to create a more sustainable and safer transportation system as well.

Route 35 between Island Beach and Pt. Pleasant is a great example. In the 50's and 60's this road was expanded to create a four lane highway through some of the most densely built beach communities in the state. While there are wide shoulders, much of the road lacks sidewalks, crosswalks and even landscaping. To reform minded planners and landscape architects Route 35 looks like a blank slate.






View Larger Map
We can make this a complete street! Photoshop anyone?

The need to cross major arterials in shore communities is very strong. Accommodating all those beachgoers with beachfront parking would require huge and unsightly parking fields. So most renters and weekend visitors use the best ways available to get there - on two feet or two wheels (or sometimes 3 wheels). These roads are often the biggest barriers to get to the beach and can be especially frightening for groups with lots of gear and small children.

The rebuild of roads like Route 35 and Route 71 will put the NJ's complete streets policy to the test. County roads such as Long Beach Blvd are not subject to the State's policy, but the discussion to make all roads ravaged by Superstorm Sandy safer begins Today!

Wednesday, October 17, 2012

Medford Township Passes A Complete Streets Policy

Medford Township has become the first municipality in Burlington County to pass a complete streets resolution. Congratulations Medford!


October 16, 2012

TOWNSHIP OF MEDFORD

RESOLUTION   132-2012

Establishing a Complete Streets Policy


            WHEREAS, the Township of Medford is committed to creating street and roadway corridors that safely accommodate all street and road users of all abilities; and
WHEREAS, the Township Council supports this “complete streets” initiative and desires to reinforce its commitment to creating a comprehensive, integrated, connected street and road network that safely accommodates all street and road users of all abilities for all trips; and
NOW, THEREFORE, BE IT RESOLVED by the Township Council of the Township of Medford that the Township hereby supports the “complete streets” initiative by making it Township policy that all public street and road projects, both new construction and reconstruction (excluding maintenance) undertaken by the Township of Medford shall be designed whenever feasible and subject to Council approval to do so in order to safely accommodate travel by pedestrians, bicyclists, public transit, and motorized vehicles and their passengers, with special priority given to pedestrian safety, subject to the following conditions:

A.  Pedestrian and bicycle facilities shall not be required where they are prohibited by law.
B.  Public transit facilities shall not be required on streets or roads not serving transit routes and the desirability of transit facilities will be determined on a project specific basis.
C.  In any project, should the cost of pedestrian, bicycle, and/or public transit facilities cause an increase in project cost exceeding 5% as determined by engineering estimates, that would have to be funded with local tax dollars, then, and in that event, approval by Council shall be obtained for the same prior to bidding the project.

I hereby certify that the foregoing is a true copy of a Resolution adopted by the Township Council of the Township of Medford, at a meeting held on the 16th day of October, 2012.

Wednesday, September 26, 2012

Press Release - Newark to Launch Complete Streets Program


INITIATIVE WILL MAKE STREETS FRIENDLY FOR ALL USERS OF ALL ABILITIES
Program designed to create street corridors and intersections that will be safe
for pedestrians, motorists, bicyclists, seniors, children, and the mobility-challenged

Newark, NJ – September 25, 2012 – Mayor Cory A. Booker and Engineering Director Mehdi Mohammadish announced today that the City of Newark adopted a Municipal Council Resolution creating a “Complete Streets Policy.” This policy was adopted by the Municipal Council on September 6, 2012, is designed to create street corridors and intersections that will be safe for pedestrians, motorists, bicyclists, seniors, children, and the mobility-challenged.

The Complete Streets Policy will create a comprehensive, integrated, connected multi-modal network by facilitating connections to bicycling and walking in all of the City’s street and sidewalk projects.

“We have taken a holistic approach to making our streets and sidewalks safe and accessible for all of our residents and visitors, whether they walk, drive, or bicycle. Newark’s streets will be the safest and most welcoming in the entire nation,” Mayor Booker said.

“We have always emphasized the highest levels of accessibility and safety in our efforts to maintain and improve our streets and sidewalks. The Complete Streets program will provide us with a comprehensive plan to achieve those goals,” said Director Mohammadish.

“Complete Streets is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal network of transportation options,” said Manager of Traffic and Signals Jack Nata. “Newark is committed to creating street corridors and intersections that safely accommodate all users of all abilities.”

The Complete Streets program calls for the following:


·         Providing safe and accessible accommodations for existing and future pedestrian, bicycle, and transit facilities.
·         Establishing a checklist of pedestrian, bicycle, and transit accommodations such as accessible sidewalks, curb ramps, crosswalks, countdown pedestrian signals, signs, curb extensions, pedestrian scale lighting, bike lanes, and shoulders.
·         Transportation facilities constructed for long-term use shall anticipate likely future demand for bicycling and walking facilities and not preclude the provision of future improvements.
·         Designs shall address the need for bicyclists and pedestrians to cross corridors, as well as travel along them, in a safe, accessible and convenient manner.
·         Designs for intersections, interchanges, and bridges shall anticipate use by bicyclists and pedestrians.
·         Bicycle and pedestrian facilities shall be designed and constructed to the best currently available standards and practices.
·         Provisions shall be made for pedestrians and bicyclists when closing roads, bridges or sidewalks for construction projects.
·         Improvements shall comply with Title VII Environmental Justice, Americans With Disabilities Act, and complement the context of the surrounding community.

Manager Nata noted that the City has already undertaken projects to enhance Newark’s accessibility for bicyclists and pedestrians, with a new bike lane on Washington Street, and new curb ramps and sidewalks as part of its Streetscaping efforts on Broad Street, Ferry Street, and other arteries.

The announcement drew praise from the Tri-State Transportation Campaign. The Campaign is a non-profit policy watchdog organization working for better transit and transportation policy in New Jersey, downstate New York, and Connecticut. 

“Tri-State applauds the passage of a Complete Streets policy in Newark, the largest city in New Jersey.  The adoption of this policy supports Newark’s other efforts, such as bike lanes and Go Bus, towards building a more green, sustainable, and progressive city. With its many green initiatives, Newark serves as an important model for sustainable streets that should be replicated elsewhere,” said Janna Chernetz, Esq., New Jersey Advocate for Tri-State Transportation Campaign.

Under the Booker administration, the Department of Engineering has begun a vigorous program of improving the City’s infrastructure. The City of Newark is close to completing the largest park expansion and rehabilitation initiative in more than a century. On July 28, 2009, Newark opened Nat Turner Park, the largest city-owned park. Through public-private partnerships, the City was able to secure $40 million for the parks initiative, in collaboration with GreenSpaces, a public/private partnership, and the Trust for Public Land. Thus far, the City has completed new parks and fields at St. Peter’s Park, Kasberger Field, Boys Park, First Street and Thomas Silk Parks, Ironbound B Field, and, in cooperation with Newark Public Schools, has built a new athletic complex at Weequahic High School.  Parks have been renovated in every ward throughout the City.

In May 2008, the Department of Engineering won the New Jersey Concrete Committee’s Merit Award in the Decorative Category for the first phase of the Broad Street Streetscaping, which saw massive renovations to denote the historic nature of the historic “Four Corners” intersection at Broad and Market Streets. The project reconstructed sidewalks, created fence panels, installed new street furniture and traffic lights to promote pedestrian safety.

In November 2009, the Department won the New Jersey Society of Municipal Engineers Honor Place Award in the Municipal Construction Management Projects “F” Category for the first phase of the Ferry Street Streetscaping Project. The $1.9 million project, funded by the City of Newark and the New Jersey Department of Transportation, was a partnership with the Ironbound Business Improvement District, designed to enhance the Ironbound’s central artery and gateway to businesses and restaurants in the East Ward, as well as improve safety conditions for pedestrians crossing the busy thoroughfares. Under the program, state-of-the-art sidewalks with planters and decorative lighting were placed down Ferry Street from Union to Madison Streets. These sidewalks improved safety for motorists and pedestrians. The project also reconstructed sidewalks, utilities and drainage, created fence panels and utilized already existing bike paths. New street furniture, signage and traffic lights also enhanced safety for pedestrians.

The Department of Engineering has also undertaken a number of pedestrian safety improvements, highlighted by “Project Red Light,” a partnership with the Police Department, the Municipal Court, and RedFlex Systems. This automated photo enforcement system snaps pictures of license plates of cars that run red lights at key intersections and automatically sends tickets to the cars’ owners. Operating since December 2009, this system has made these intersections safer for both motorists and pedestrians.

In 2012, the Department launched $27 million worth of streetscaping, road re-surfacing, traffic calming, and traffic signal installations. The projects will improve the City’s infrastructure and enhance safety on its roads for motorists and pedestrians alike. Among the projects is the largest traffic-calming program in Newark’s history, currently underway in the West Ward.

The Department has also launched a comprehensive rehabilitation of the City’s Recreation centers, Police precincts, firehouses, and other facilities. At the same time, the Department of Engineering has opened new repair facilities for City-owned vehicles, added environmentally-friendly electric cars to its motor fleet, launched green initiatives, and is continuing the restoration of historic City Hall.

For information about this or any other City of Newark policy or program, contact the Non-Emergency Call Center at (973) 733-4311.

Contact:         Newark Press Information Office: (973) 733-8004.
                        E-mail: Pressoffice@ci.newark.nj.us

Tuesday, August 14, 2012

Atlantic City Bicycle and Pedestrian Plan Open House Tonight

If you live, work or visit Atlantic City then you are welcome to attend and comment on the City's Bicycle and Pedestrian Plan at the open house tonight August 14th at the Atlantic City Convention Center/Train Station from 5 to 8PM in Room 314.

Atlantic City has one the highest bicycle/walk/transit commute mode shares in the State with a high pedestrian crash rate. Since 1980 drive up Casino development has dominated the  landscape of the City and little was done to protect the safety of bicyclists and pedestrians. While some enhancements have been completed in "The Walk" shopping district, Michigan, Atlantic, Arctic and Baltic Avenues cut through the busy shopping districts as multi-lane roads which encourage high speeds. Right turn on red is also allowed at most of those intersections, further exacerbating a chaotic situation.

For bicycling there are two major proposals planned - 24 bike access on the non-commercial north end of the boardwalk along with a complimentary on street loop plus a proposed lane reduction of Atlantic Avenue with buffered bike lanes or cycle track added. What we will be looking for in the plan is a network of bike routes that will connect all the neighborhoods and the surrounding communities, such as improving access to the Brigantine Bridge.

Details and graphics from the meeting as well as instructions to comment on the plan will be posted on the Active Transportation for Atlantic City Facebook Page. AC's Bike and Ped plan is the first one in the State that is being completed after the Municipality has passed a complete streets resolution. Implementation of the plan is a litmus test to see if the City is ready to walk the walk towards complete streets.



Atlantic City Statistics:

Commute To Work
Transit - 27%
Walk - 16%
Bike - 2%

Vehicular Crashes 2011 - 2,307

Complete Streets Policy resolution passed on December 7, 2011



Tuesday, July 17, 2012

Morristown passes its own Complete Streets Policy

Our good friend, Kendra Arnold of Bike and Walk Morristown informed us just a few minutes ago that Morristown has passed its very own comprehensive Complete Streets Policy.

One of the most telling parts of a government entity's commitment to it's Complete Policy is in the Exceptions.  While the policy is otherwise very good, the exceptions are a little vague and could be manipulated to scrap otherwise worthy / needed complete street projects. "d" is particularly concerning as there is no definition of "disproportionate cost." The standard is that bike/ped improvements not exceed 15% of the total project cost.  The vague exceptions of concern are below.
c) Detrimental environmental or social impacts outweigh the need for these accommodations.

d) Cost of accommodations is excessively disproportionate to cost of project.

e) The safety or timing of a project is compromised by the inclusion of Complete Streets.
Putting that aside another mutual friend, Gerald points out that the policy places emphasis on planning for future bicyclists and pedestrians.  A good cool point.  Also the checklists are pretty neat and make it simple for implementers in the future to follow the policy.

Good job Morristown!

Thursday, June 16, 2011

3 Complete Streets seminars coming in July for locals

NJ Future just reported about how Jersey City and Ridgewood both passed Complete Streets policies recently.  Great news but NJ Future notes that this brings the total number of municipalities with Complete Streets policies up to 12 and counties (Monmouth) up to 1.  When you realize that New Jersey has 566 municipalities and 21 counties, you begin to see that there is a long way to go.

So step in Sustainable Jersey, supported by Shaping NJ (and a host of other organizations), which has scheduled three workshops on Complete Streets for local activists interested in pursuing the policy in their towns. Each workshop will highlight basic policy principles, potential resources and local case studies. The workshops will be held on:
  • July 14 at Stockton College from 1 to 3:30 p.m. (register)
  • July 19 at the West Windsor Municipal Building from 9:30 a.m. to noon (register)
  • July 21 at the Rahway Public Library from 6 to 8 p.m. (register)
And as NJ Future reported in their story about Jersey City and Ridgewood, NJDOT is encouraging towns to adopt their own Complete Streets policies by giving preferential consideration for municipal aid grants to towns that have adopted such policies.  To aid towns even further, NJDOT is also working developing standards for good Complete Street roadway designs for urban, suburban and rural settings.

So make sure you and/or one or more of your local town officials try to attend one of these seminars  and get your own Complete Streets policy in place.

Friday, March 4, 2011

Evesham Resident Wants Sidewalks - Gets Results

Full article in the Burlington County Times (Phillyburbs.com)

Evesham resident Jonathan Allen speaks out about lack of sidewalks along Elmwood Road near the Inglis Gardens at Evesham, an independent living facility for adults living with disabilities.



Allen one of about a dozen residents at the facility who walks along Elmwood brought his concerns to the Evesham Township Council on Tuesday and won support:

By Wednesday, Mayor Randy Brown said they’ve already begun work on a plan to expand the sidewalks in the area from Inglis Gardens to Route 70 on both sides of the road, install ramps that are in compliance with the Americans with Disabilities Act at Route 70 and Evesboro-Medford Road intersections.

“We’re going to fill the void from Inglis toward Route 70,” Brown said. “We’re hoping to get the sidewalks in within 60 to 90 days.”

Kudos to Jonathan for being a champion for local pedestrian issues and to the Evesham Township Council for moving one step closer towards complete streets in their community.




View Larger Map

Sunday, January 2, 2011

NJDOT video of proposed Rt 72 Manahawkin Bay Bridge now shows barrier protected walkway

Last June, WalkBikeJersey broke the story about the initial proposal for Rt 72 Manahawkin Bay Bridge to Long Beach Island having less then desirable bicycle and pedestrian facilities. The NJDOT website for the project still says that the proposed bicycle and pedestrian improvements will include a six foot wide sidewalk and a bicycle lanes that will be as little as 5 feet wide in places.

Route 72 Manahawkin Bay Bridge

View Larger Map

However, a video for the project on the same NJDOT website now shows the proposed bridge having a protected pedestrian walkway (multiuse path?) that appears to be nearly the same width as one motor vehicle lane.

Video screengrabs of the proposed Rt 72 Bridge clearly show a barrier protected
walkway on the main western span. Source: NJDOT / Parsons Brinkerhoff

WalkBikeJersey has been monitoring this project since it will be the first major bridge replacement by NJDOT since it adopted a Complete Streets Policy last year. If the video is to be believed and actually shows a revised proposal for the bike/ped amenities, this is indeed welcomed news and clearly has NJDOT starting 2011 on a welcomed note.

Still, this edition of the video is relatively new as an older version of the video of this project did not clearly show a protected walkway. It also only shows the larger western span (the Manahawkin Bay Bridge is actually a series of 3 bridges) and does not show the eastern 2 spans where bicyclists are proposed to be accommodated by 5 foot wide bicycle lanes. Also not shown are the approaches to the bridge on either side which can make or break the usability of the facility for more cautious non-motorized users.

Stay tuned the WalkBikeJersey for continuing updates on this project.

The RT 72 Manahawkin Bay Bridge video can be seen in its entirety on the NJDOT website here.

Thursday, October 14, 2010

*SOLD OUT* Complete Streets Summit *SOLD OUT*

The Complete Streets Summit scheduled for next week has proven to be a major hit and is entirely booked out! (It can't really be "sold out" since its a free event) I've been told by the good folks at VTC that they have had to turn away many interested parties as they try to see if there is any way they can accommodate more attendees.

While it is unfortunate that there is not enough room for everyone to attend, it is great news to hear that this topic has proven to be so popular with local officials from around New Jersey. All those in attendance are sure to get a great lesson on the topic from Michael Ronkin and the other experts talking at the Summit.

Compiling Questions on Complete Streets and Liability

This question comes directly from Ranjit Walia at the Voorhees Transportation Center via the NJ BikePed Listserve. Send your answers directly to him as I'm sure he could use a number of examples.

Have you ever been told you can't improve your streets by providing more bicycle, pedestrian, traffic calming, or other type facilities because of concerns about liability? This is your chance to help us put together a list that we will be compiling for attorneys who will be working with us on how to address the concerns people have about liability and Complete Streets and debunk misconceptions on the topic. Please send me an e-mail to share your questions and/or examples of liability issues you have confronted. If you could provide the following information it would be appreciated:

What was it you proposed/discussed?
Who told you that it was a liability issue? (attorney, engineer, planner, etc.)
What exactly was the liability they associated with it?

If you have any other questions on liability as it relates to Complete Streets please feel free to submit those as well. Look forward to seeing everyone's responses!


Ranjit Walia AICP
Senior Research Specialist
Alan M. Voorhees Transportation Center
33 Livingston Avenue, Rm 446
New Brunswick, NJ 08901
phone: 732-932-6812 xt. 771
fax: 732-932-3714


Wednesday, October 13, 2010

NJDOT shows marked progress on Complete Streets

Back in the early part of the summer I felt that I was given no other choice but to question NJDOT’s commitment to its Complete Streets Policy following the release of the preliminary draft proposal for a reconstructed Manahawkin Bay Bridge. The proposal at that time to rebuild the only means of access to Long Beach Island gave pedestrians and cyclists only the bare minimum of facilities. The preliminary plan would have made the crossing something to be endured and not enjoyed and it was clear that this crossing would only be undertaken by only the most desperate of pedestrians and only the boldest cyclists. Fortunately, word has it that bicycle and pedestrian access on this bridge is being reviewed, possibly in part due to the critique of the initial proposal from this very blog.

However the good news doesn’t stop there. WalkBikeJersey has also learned that NJDOT has been hard at work making sure that its designers, engineers and project supervisors fully understand what a Complete Street truly entails. To do so, this past summer they had no other than Michael Ronkin come and speak at NJDOT headquarters, who is by far one of the World’s leading experts on the finer points of Complete Street design. Word has it that there were a number of converts amongst those in attendance and that others took home good lessons as to what they should be striving for in their designs. This is very welcome news indeed and all of us here at WalkBikeJersey are more than happy to hear of NJDOT’s continued commitment to Complete Streets.

As you may already know, NJDOT’s work on Complete Streets doesn’t end there. Next week, NJDOT and its partners at the Voorhees Transportation Center at Rutgers University will once again be hosting Michael Ronkin in a Complete Streets Summit for local municipal and county officials. Just as NJDOT felt that it needed to give its own employees a top-notch education on the topic, it also wants to give local officials the same opportunity to learn about Complete Streets from one of the best. NJDOT is hosting this summit because in the future, local projects seeking state aid will be evaluated for their commitment to the Complete Streets concept. The more complete a proposal is, the more likely it will receive state funding. This tying of state funding to Complete Streets will hopefully have a great impact on how local roadways are redesign since these local streets are where a vast majority of walking and biking already occur in New Jersey.

Bravo NJDOT!


Notes on Complete Streets:

  • A Complete Street is one that well serves the needs of all users, including automobiles, pedestrians and bicyclist, and where applicable transit users and heavy vehicles.
  • Complete Streets demands are context sensitive. What is appropriate to make a rural state highway “Complete” is not the same for where that same highway may enter a town and becomes that town’s long time, traditional Main St.
  • When designing a Complete Street there are a number of questions one should ask. Here are few that I came up with:

- Would you feel comfortable walking along this roadway?

- Would you feel comfortable riding a bicycle along this roadway?

- Would you feel comfortable walking along this roadway with a child in a stroller? Would you feel comfortable riding a bicycle along this roadway with a 10-year-old child?

- If near a school or other area frequented by children, would you feel comfortable allowing a 10-year-old child to walk or ride a bike along this roadway without direct adult supervision?

- Are crosswalks present? If there are attractors (destinations like shops, schools, residences, parks, etc.) on both sides of the roadway are crosswalks conveniently located or would pedestrians and cyclists need to travel a far distance (like 1000 feet) out of their way to the nearest crosswalk?

- Could an elderly grandmother cross the street safely or before pedestrian signal expires?

- Would you feel comfortable or even be able to travel along the roadway in a wheelchair? Would you feel comfortable or even be able to cross the roadway in a wheelchair?

- Would you feel comfortable walking a crosswalk blindfolded? This is essentially what your design will be requiring a blind pedestrian to do.

- Could you find the pedestrian signal button if you were blindfolded? (There are design standards for crosswalk button placement to address the needs on blind pedestrians.)

- Does the traffic signal require pedestrians to press a pedestrian signal button even though pedestrian traffic volume is high, if not constant?

- Could you press the pedestrian signal button if you had arthritic fingers? What about if you had no fingers? (Hint: Could you press it with your elbow or even just your shoulder.)

- If applicable are there safe areas for people to wait for transit service? Is there seating? Is the area sheltered from the weather?

- If there is bicycle parking demand (i.e. this is a downtown area with commercial establishments or other attractors), is bicycle parking provided for within the right-of-way if there is no room elsewhere? Is it properly located? Does the bicycle parking meet modern bicycle parking design standards? Does the bicycle parking provided meet the demand?

Wednesday, September 22, 2010

Register now for the NJ Complete Streets Summit!

The below message comes from Peter Bilton and the other good folks working hard at the Alan M. Voorhees Transportation Center at Rutgers University. This event is geared toward municipal and county officials so make sure local representatives know about it and get them to attend!

You should also know that Michael Ronkin, the keynote speaker, is with little doubt one of the leading experts in the field of Complete Streets, and bicycle and pedestrian planning and accommodation. Don't miss out on an opportunity to here one of the best in the world speak on this topic... and for free, no less!


Register now for the NJ Complete Streets Summit! (Or go to http://tinyurl.com/cssummit.) This is a free event.

NJ Complete Streets Summit
Friday, October 22, 2010
9:00 AM - 4:00 PM
(Registration begins at 8:30 AM)

Rutgers Student Center
126 College Ave.
New Brunswick, NJ


The New Jersey Department of Transportation and the Voorhees Transportation Center, with funding from the Federal Highway Administration, are pleased to announce the NJ Complete Streets Summit, cosponsored by the NJ Chapter of the American Planning Association and the Metropolitan Section of the Institute of Transportation Engineers.

The Department of Transportation recently adopted a Complete Streets Policy, and would like to spread the word about this program, encouraging more counties and municipalities to adopt their own policies. The summit will educate engineers, planners, and elected officials about Complete Streets, its benefits and costs, and how to overcome barriers to implementing a Complete Streets policy. Topics will include an introduction to Complete Streets, policies and supporting processes, design and planning, cost and funding, and liability.

Michael Ronkin, an internationally-recognized consultant and speaker on innovative, practical street design, will be the keynote speaker. Assemblywoman Grace Spencer (invited) and NJDOT Commissioner James Simpson will give welcoming remarks.

Complete Streets are designed and operated to enable safe access for all users - pedestrians, bicyclists, motorists and transit riders of all ages and abilities. Instituting a complete streets policy ensures that agencies routinely design and maintain the entire right of way to enable safe access for anyone who may use it. Having a Complete Streets policy can benefit a community in many ways, including making their grant applications for state funding more competitive. A Complete Streets program is also eligible for points toward Sustainable Jersey certification and can help a municipality meet its obligations under the Americans with Disabilities Act.

Register here for this exciting Summit by October 8th! The event is free and space is limited. AICP and ITE credits are pending.

For more information, please see the attached flyer. You can also contact us at bikeped@rci.rutgers.edu or (732) 932-6812 ext. 586.

Hope to see you there,
Peter Bilton
Alan M. Voorhees Transportation Center
Rutgers, The State University of New Jersey

Sunday, August 1, 2010

Pennington NIMFY's Oppose Complete Streets Project on King George Rd.

The Times of Trenton reports that residents on King George Road in Pennington have organized into vocal opponents to plans to make their road more accessible to bicyclists and pedestrians. Residents oppose the addition of bike lanes and sidewalks to their street.

A look at Google Maps reveals that the west end of King George already has sidewalks, but the east end resembles a quiet country lane. Not knowing the traffic volumes King George there is probably a desire among planners to upgrade the road while neighbors like the look of their street.

And the question of traffic volume may be where bicycle and pedestrian advocates stand on this issue. If the road has become a cut through street with high volume then the complete streets solution is to add bike lanes and sidewalks. But if the traffic volume AND traffic speeds are low (less than 1500 vehicles per day and real speed of 25mph) then the neighbors may be on to something.

Anyone with more details on this project is welcome to submit comments.


View Larger Map

Monday, July 26, 2010

West Windsor 2nd Municipality in NJ to pass Complete Streets Resolution: Monmouth County 1st County

Major progress for Complete Streets in New Jersey was made this pass week with a second municipality passing an ordinance along with New Jersey's first county to do so as well. While NJDOT lead the way passing its own Complete Streets Policy back in the winter, most of us know that it is the county and municipal streets where a vast amount (if not a majority) of walking and biking is done.

According to the West Windsor Bicycle and Pedestrian Alliance, West Windsor is now the 2nd New Jersey municipality after Montclair to pass a Complete Streets Resolution.

Monmouth County had on its July 22 agenda a Complete Streets resolution and reports are that it passed.

For those looking to make headway in your own local and county governments, links to all three resolutions are included for you to reference below.

Montcair
West Windsor
Monmouth County

Wednesday, February 3, 2010

Deadline tommorrow for comments on Scudder Falls Bridge

As report by John and our friends at the Bicycle Coalition of Greater Philadelphia:

Comments to the Delaware River Joint Toll Bridge Commission on this issue are due tomorrow, February 4th. Send the Commission an email letter stating your support for a bicycle/pedestrian pathway being included in the final design of the Bridge.

The Philadelphia Inquirer ran an indepth story and editorial today about the I-95 Scudder Falls Bridge and how a bicycle/pedestrian walkway that is being considered by the Bridge Commission may not get included because it is "prohibitively expensive." The Commission is rationalizing that 9 motor vehicle lanes (up from the current 4), 2 lanes for buses and 2 12-wide shoulders are necessary and a given that they will be built, but a bicycle/pedestrian path "is a cost issue" and may not be get included in the final design.

Obviously,we at the Bicycle Coalition of Greater Philadelphia don't agree and are pleased that the Inquirer Editorial Board is with us! The cost of a bicycle/pedestrian pathway is well below the threshold of what the feds consider "unreasonable", and there are other important positive benefits to having providing bicycle/pedestrian access that outweigh costs. Accommodating all users in transportation projects is federal and state policy, and one that this Commission should adhere to. The Commission should be designing a bridge with a 50-75 year life span for a future of more bicycling and walking and not pretend that it doesn't have a role to play in making the region more sustainable. As the Inquirer said today, "it would be an absurd planning decision to build a new bridge that made no room for cyclists and hikers to cross between two historic canal trails."

BCGP Final Comments (pdf)





View Philadelphia Regional Trails in a larger map

Thursday, December 17, 2009

NJDOT Issues a Complete Streets Policy

From John and our friends at the Bicycle Coalition of Greater Philadelphia:

Below is the New Jersey Complete Streets policy signed by Commissioner Dilts. This is a big step forward and we (the Bicycle Coalition of Greater Philadelphia) are pleased that NJ DOT has joined the Delaware, Oregon and other states with complete streets policy (we at WalkBikeJersey are equally pleased).

The policy is long and involved so it will take some time for us to fully analyze its potential effectiveness. At first glance we like the inclusion of resurfacing projects and the offering of incentives for Local Aid projects (the transportation money for towns and counties). On the other hand we are concerned about Exemption 5 (highlighted below in bold italics) which suggest that safety or timing issues could result in the exclusion of complete streets elements (we at WalkBikeJersey agree). A broad statement that may offer lots of wiggle room for reluctant project managers. To take an objective eye on the policy consult the Complete Streets policy elements.


DEPARTMENT OF TRANSPORTATION
POLICY

I. PURPOSE
To create and implement a Complete Streets Policy in New Jersey through the planning, design, construction, maintenance and operation of new and retrofit transportation facilities within public rights of way that are federally or state funded, including projects processed or administered through the Department’s Capital Program.

II. DEFINITIONS
A Complete Street is defined as means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal network of transportation options.

III. BACKGROUND
The benefits of Complete Streets are many and varied:
• Complete Streets improve safety for pedestrians, bicyclists, children, older citizens, non-drivers and the mobility challenged as well as those that cannot afford a car or choose to live car free.
• Provide connections to bicycling and walking trip generators such as employment, education, residential, recreation, retail centers and public facilities.
• Promote healthy lifestyles.
• Create more livable communities.
• Reduce traffic congestion and reliance on carbon fuels thereby reducing greenhouse gas emissions.
• Complete Streets make fiscal sense by incorporating sidewalks, bike lanes, safe crossings and transit amenities into the initial design of a project, thus sparing the expense of retrofits later.

IV. POLICY
The New Jersey Department of Transportation shall implement a Complete Streets policy though the planning, design, construction, maintenance and operation of new and retrofit transportation facilities, enabling safe access and mobility of pedestrians, bicyclists, transit users of all ages and abilities. This includes all projects funded through the Department’s Capital Program. The Department strongly encourages the adoption of similar policies by regional and local jurisdictions who apply for funding through Local Aid programs.

DEPARTMENT OF TRANSPORTATION
POLICY

1. Create a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip generators such as employment, education, residential, recreational and public facilities, as well as retail and transit centers.

2. Provide safe and accessible accommodations for existing and future pedestrian,
bicycle and transit facilities.

3. Establish a checklist of pedestrian, bicycle and transit accommodations such as
accessible sidewalks curb ramps, crosswalks, countdown pedestrian signals, signs,
median refuges, curb extensions, pedestrian scale lighting, bike lanes, shoulders and
bus shelters with the presumption that they shall be included in each project unless supporting documentation against inclusion is provided and found to be justifiable.

4. Additionally, in rural areas, paved shoulders or a multi-use path shall be included in all new construction and reconstruction projects on roadways used by more than 1,000 vehicles per day.
Paved shoulders provide safety and operational advantages for all road users. Shoulder rumble strips are not recommended when used by bicyclists, unless there is a minimum clear path of four feet in which a bicycle may safely operate. If there is evidence of heavy pedestrian usage then sidewalks shall be considered in the project.

5. Establish a procedure to evaluate resurfacing projects for complete streets inclusion according to length of project, local support, environmental constraints, right-of-way limitations, funding resources and bicycle and/or pedestrian compatibility.

6. Transportation facilities are long-term investments that shall anticipate likely future demand for bicycling and walking facilities and not preclude the provision of future improvements.

7. Address the need for bicyclists and pedestrians to cross corridors as well as travel along them. Even where bicyclists and pedestrians may not commonly use a particular travel corridor that is being improved or constructed, they will likely need to be able to cross that corridor safely and conveniently. Therefore, the design of intersections, interchanges and bridges shall accommodate bicyclists and pedestrians in a manner that is safe, accessible and convenient.

8. Design bicycle and pedestrian facilities to the best currently available standards and practices including the New Jersey Roadway Design Manual, the AASHTO Guide for the Development of Bicycle Facilities, AASHTO’s Guide for the Planning, Design and Operation of Pedestrian Facilities, the Manual of Uniform Traffic Control Devices and others as related.

9. Research, develop and support new technologies in improving safety and mobility.

10. Make provisions for pedestrians and bicyclists when closing roads, bridges or sidewalks for
construction projects as outlined in NJDOT Policy #705 – Accommodating Pedestrian and Bicycle Traffic During Construction.

11. Improvements should also consider connections for Safe Routes to Schools, Safe Routes to Transit, Transit Villages, trail crossings and areas or population groups with limited transportation options.

12. Establish an incentive within the Local Aid Program for municipalities and counties to develop and implement a Complete Streets policy.

13. Improvements must comply with Title VI/Environmental Justice, Americans with
Disabilities Act (ADA) and should complement the context of the surrounding community.

14. Implement training for Engineers and Planners on Bicycle/Pedestrian/Transit policies and integration of non-motorized travel options into transportation systems.

15. Establish Performance Measures to gauge success.

V. EXEMPTIONS
Exemptions to the Complete Streets policy must be presented for final decision to the Capital Program Screening Committee in writing by the appropriate Assistant Commissioner and documented with supporting data that indicates the reason for the decision and are limited to the following:

1) Non-motorized users are prohibited on the roadway.
2) Scarcity of population, travel and attractors, both existing and future, indicate an absence of need for such accommodations.
3) Detrimental environmental or social impacts outweigh the need for these accommodations.
4) Cost of accommodations is excessively disproportionate to cost of project, more than twenty percent (20%) of total cost.
5) The safety or timing of a project is compromised by the inclusion of Complete Streets.

An exemption other than those listed above must be documented with supporting data and must be approved by the Capital Program Committee along with written approval by the Commissioner of Transportation.

VI. AUTHORITY
N.J.S.A. Title 27
----

Thursday, December 3, 2009

Bergen County Visioning Day

Saturday, December 5, 2009 – 9:30am to 2:00pm
Bergen County Learning Center
Bergen County Administrative Building
One Bergen County Plaza, Hackensack, NJ 07601
(light lunch to be served)

Be mindful however if you go, that this meeting is a county wide master plan touching upon many aspects planning and is not solely focused upon bicycle and pedestrian or even transportation issues. That said, please let decision makers understand that these issues are of utmost importance.

The below message is from our friend Stephen Mosca at Go-One LLC and local advocate in Maywood, New Jersey about the plan:

Cycling-related deaths and injuries are rising in New Jersey and cyclists from around the state are coming together to address this disturbing trend. On December 5th Bergen County will sponsor a “Visioning Day”. Many actions are taking root in our state towards more effective transportation for all citizens. The New Jersey Department of Transportation is conducting Pedestrian Safety Impact Team (PSIT) meetings to study along NJ Route 93 (Grand Street) in Bergen County; Bergen County members are involved in the Bicycle/ Pedestrian Think Tank in New Brunswick, NJ. Sponsored by the NJ/ DOT and Rutgers University Voorhees Transportation Policy Planning Group; Municipalities around New Jersey are par-taking in the “Sustainable Jersey” Program (Safe Route to School & Complete Streets); and, people are realizing the health benefits, environmental, noise and congestion benefits of cycling. We need to be proactive and apply the basic lessons of transportation.

Cyclists throughout the state will attend, representing bicycle clubs, shops, advocates, retailers, manufacturers, and other interested individuals committed to safe access of cyclists to our state’s roads and trails. State legislators and transportation policy officials will also attend. The following are “Bicycling” transportation transformation recommendations to the County of Bergen to Considers as part of this Master Planning Exercise.


1. “Complete Streets” design on County Road Bike Lane Implementation.
2. Cyclist/motorist education
3. Three (3) Feet Passing and other Legislation
4. Creating bicycle-friendly communities in New Jersey.
5. Bicycles on Busses with NJ Transit.
6. More Bicycles on Mass transit Trains with NJ Transit. Bicycle Path interconnection from rail stations to points NSE&W.
7. More Bergen County retail establishments allowing Bicycling (i.e. Bicycle usage is against the law in the new Bergen Town Mall Property in Maywood). This needs to change!
8. Construction of feeder paths to the Rochelle Park/ Wood Ridge Mixed Use Path from all points NEW&S.
9. Implementation of a NYC style bicycling Master plan with Connection to the GW Bridge, Verazzano and Lincoln and Holland Tunnels from all points NSE&W.
10. Partner with Voorhees Bike Group at Rutgers to become the most progressive Bike County in NJ.
11. Encourage Municipalities to begin the bicycle path, trails and lane inter-connectivity studies. Use the TMAs and Google Maps/ DOT Analysis technology.

Thursday, October 15, 2009

UPDATE - Montclair passes 'Complete Streets' policy

Montclair has passed a Complete Streets policy, as reported in this October 13th article from the Montclair Times. The Montclair council was able to quickly move past some differences and approve a slightly revised version of the originally proposed policy. (Click here for the language of Montclair's resolution.)

We at WalkBikeJersey congratulate Montclair for being the first municipality or county in New Jersey, that we are aware of, to make such progress regarding Complete Streets. However, New Jersey still has a long way to go with regards to this and other bicycle and pedestrian safety initiatives.

As reported earlier, the Tri-State Transportation Campaign, NJ Future, along with our friends at the Bicycle Coalition of Greater Philadelphia and at AARP New Jersey are pushing for a state level Complete Streets policy. We support them in their efforts as this is a critical policy that must move forward if the needs bicyclists and pedestrians are to advance here in New Jersey.